Engineering

Engineering Documents. Guidelines. Requirements.

!--


-->

IRWD Engineering Counter

The engineering counter is located in the main lobby of the IRWD Offices at 15600 Sand Canyon Avenue in Irvine.
Please note the engineering counter hours of operation below:

Monday - Thursday: 8am - 4:30pm
Every other Friday: 8am - 4:00pm

Phone: 949-453-5548
Email: Engineeringinfo@irwd.com




Engineering Counter Calendar Download 2019»

  • Submitting or Picking up Improvement Plans: Development and improvement plans are reviewed for conformance to the District Standards. Submittal requirements can be found in the IRWD Procedural Guidelines, available below.
  • Application for a Temporary or Permanent Water Meter: Information on what to bring when submitting meter applications is included on the Meter Requirements Sheet for both residential and non-residential properties. Because this is an extensive list of requirements, please review this list (available below) prior to visiting the Engineering Counter.
  • Not Sure if you need to Submit Plans for Approval? Bring your plans to the Engineering counter to discuss requirements with one of the IRWD Development Services engineers.


NEW eNotify

Stay Up to Date On Engineering Documents with IRWD eNotify

Sign up for eNotify to receive automatic notifications when updated documents become available online.

FY 2019/20/21 Capital Budget

 


Construction Projects

Procedural Guidelines


Construction Manual

February 2016 Revision
January 2016 Revision

Environmental Documents

Fats Oils and Grease
Program - FOG

Meter Application  Requirements

Recycled Water Salt Management Plan

 

Connection Fees

Maps & Facilities

!-- -->

Recycled Water Checklist
and Sign Specifications

GIS Maps and Record Drawings

Rates & Charges, Rules and Regulations

 

 

Save

Save